Design start: 08.2021
Project completion: 03.2023
Scope of the project: 14 bridge structures (2 bridges, 12 viaducts)
Investor: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Poznaniu
Contractor: Lafrentz Polska Sp. z o.o.
Constructor: Mirbud S.A. (consortium leader), Kobylarnia S.A. (consortium partner)
Scope of project : Architectural, construction and technical design of the bridge industry (ZRID decision).