Reconstruction of the bridge in the course of the district road No. 3090P over the Warta River in the town of Ląd

Design completion : 04.2022
Overall lenght : 210,80 m
Deck width: 11,00 m
Span length: 36,00+50,00+44,00+44,00+36,00 m
Construction type: Composite beam structure
Inwestor: Powiatowy Zarząd Dróg w Słupcy
Contractor: Powiatowy Zarząd Dróg w Słupcy
Scope of project : Construction and detailed bridge design, decision on environmental Environmental
conditions, investment location decision, water law permit, construction permit

Read more ...

Construction of a footbridge for cyclists at the bridge over the Bystry Canal in Augustow within the provincial road No. 664 Augustow – Lipsk – in the design and build system

Design completion : 08.2021
Overall lenght: 66,00 m
Deck width: 3,40-3,80 m
Span length: 65,00 m
Construction type: Composite beam structure
Inwestor: Podlaski Zarząd Dróg Wojewódzkich w Białymstoku
Contractor/ Constructor: STRABAG Sp. z o.o.
Scope of project : Multi-branch construction and executive design, workshop design, decision
about environmental conditions, water permit, building permit

Read more ...

Construction of a bridge over the Warta River along with access roads in the course of provincial road No. 431 in Rogalinek.

Design completion : 02.2021
Overall lenght: 202,75 m
Deck width: 15,90 m
Span length: 50,00+100,00+50,00 m
Construction type: Box construction, prestressed, overhang construction.
Inwestor: Wielkopolski Zarząd Dróg Wojewódzkich w Poznaniu
Contractor: SKANSKA S.A.
Scope of project : Executive and technological design

Read more ...

Treetop path

Design start : 04.2019
Design completion : 01.2020
Total lenght : ~250 m
Width : 2,1 m
Construction : wooden
Investor : Miasto Poznań, Zakład Lasów Poznańskich
Contractor/Constructor : Mosty Poznań Sp. z o.o.
Scope of project : Treetop design

The construction and working design was prepared on the basis of an architectural concept prepared by Biuro Projektowe AN-Architekt mgr inż. arch. Adam Nogaj

Read more ...

Bridges design along S61 (km 23+255 to km 42+765) – building and design system

Design start : 09.2018
Design completion : IV.2020
Numbers : 24 bridges/flyovers
Investor : GDDKiA w Olsztynie
Contractor : Lafrentz Polska Sp. z o.o.
Constructor : Trakcja PRKiK S.A., Przedsiębiorstwo Eksploatacji Ulic i Mostów Sp. z o.o., Mostostal Warszawa S.A.
Scope of project : Bridges design and working plans with specifications

Read more ...